500 MW phased AI campus — Phase 1 in 2027. This datacenter / powered-site opportunity is listed in Kansas (North America). The public tile shows the verified headline specification; the complete data room — full spec sheet, exact location, counterparty, and pricing — is shared once both sides agree to connect.
Every Ax3 listing is vetted by the broker desk before going live: asset existence, control of the capacity, and realistic timelines are confirmed directly with the owner.