Ax3.ai
Home / Marketplace / DENEB
Available nowAx3 code · DENEB · vendor identity private until connect

NVIDIA B300 and GB300 GPU capacity in Texas, ready for service Q1 2027

Deal overview

Reserved NVIDIA Blackwell capacity in Texas with a Q1 2027 ready-for-service window, offered across two SKUs: B300 from $4.09/GPU-hr and GB300 from $4.58/GPU-hr. Contracts run 3, 4 or 5 years, with the longer terms carrying the lower rates — so a buyer can match the commitment to the length of their training or inference program rather than paying a single blended price.

Texas gives this listing competitive power economics and one of the most active build pipelines in the US, which is what makes a committed Q1 2027 date credible at these rates. B300 suits dense training and large-batch inference on standard 8-GPU nodes; GB300 brings the NVL72 rack-scale NVLink domain for the largest models and long-context serving. The public tile shows the verified headline specification; the complete data room — cluster sizing, node and fabric specs, exact location, counterparty, and full term sheet — is shared once both sides agree to connect.

Every Ax3 listing is vetted by the broker desk before going live: asset existence, control of the capacity, and realistic timelines are confirmed directly with the owner.

Public specification

GPUs
NVIDIA B300 and GB300
B300 rate
from $4.09/GPU-hr
GB300 rate
from $4.58/GPU-hr
Terms
3, 4 or 5 years · longer terms at the lower rates
RFS
Q1 2027
Location
Texas, USA
Cluster size
Shared on connect

How connecting works

  1. Submit an inquiry on this page — free, no account needed.
  2. Ax3 qualifies and routes it within 24 hours.
  3. Warm introduction with the full spec sheet and exact pricing; identities revealed once both sides agree.
More on the marketplace

Related live deals

Ax3 AvailableAx3 CODE · CASCADE 2
Hot dealGPU ClusterSeattle, USA
2× GB200 NVL72 — 144 Blackwell GPUs, Live Today, Seattle
GPU
NVIDIA GB200 NVL72 · 144 Blackwell GPUs · 2 racks
Storage
VAST all-flash · 1.16 PB usable
RFS
Live today · 30–45 days to handover
Term
5-year · 40% prepaid
Expansion
+10 GB300 NVL72 racks · 12 total
Fabric
InfiniBand · direct liquid cooling · 24/7 managed
Price · $4.86/GPU-hr · 5-year term · Live today
Ax3 AvailableAx3 CODE · ANTARES 30
Hot dealPowered SiteTexas
30 MW AI colocation in Texas — ready for service spring 2027
Capacity
30 MW
Campus
Scaling to 130 MW by late 2027
RFS
Mar/Apr 2027
Term
5 to 10 years
Location
Texas
Price · Inquire · exact quote on connect