NVIDIA Vera Rubin NVL72 capacity at a 35 MW liquid-cooled site in Northern Ohio, booked in 1,008-GPU units of 14 racks each. The full site carries 8 units — up to 8,064 GPUs across 112 racks — on 28 MW of IT load at a 1.25 PUE. Early access is targeted for May 2027 with full service in June 2027, priced at $7.70/GPU-hr on a 5-year term with a 20% or 25% deposit.
The 35 MW is confirmed in writing, which puts this listing ahead of most 2027 Rubin-generation offers that still depend on a utility commitment. The 1,008-GPU unit of sale lets a buyer start with a single pod and scale on the same site, fabric and term sheet, and the rate undercuts the other Vera Rubin NVL72 listings on the marketplace. The public tile shows the headline specification; the complete data room — rack and fabric configuration, exact location, counterparty and full term sheet — is shared once both sides agree to connect.
Cluster size, site and counterparty details are confirmed by Ax3 before any introduction.