Ax3.ai
Home / Marketplace / PROCYON 24
Available nowAx3 code · PROCYON 24 · vendor identity private until connect

24 MW contracted site — transferable contract

Deal overview

24 MW contracted site — transferable contract. This datacenter / powered-site opportunity is listed in West Georgia (North America). The public tile shows the verified headline specification; the complete data room — full spec sheet, exact location, counterparty, and pricing — is shared once both sides agree to connect.

Every Ax3 listing is vetted by the broker desk before going live: asset existence, control of the capacity, and realistic timelines are confirmed directly with the owner.

Public specification

Capacity
24 MW (16 MW flowing)
Power
~5¢ all-in 12-mo avg
Contract
Transferable, thru 2027
Interconnect
115 kV

How connecting works

  1. Submit an inquiry on this page — free, no account needed.
  2. Ax3 qualifies and routes it within 24 hours.
  3. Warm introduction with the full spec sheet and exact pricing; identities revealed once both sides agree.
More on the marketplace

Related live deals

Ax3 AvailableAx3 CODE · ALTAIR 12
Hot dealPowered SiteSW Kansas
12 MW power-ready site — flowing today
Capacity
~12 MW
Interconnect
115 kV adjacent
Power
~5¢ industrial rate
Availability
Connected & flowing today
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · ANTARES 30
Hot dealPowered SiteTexas
30 MW AI colocation in Texas — ready for service spring 2027
Capacity
30 MW
Campus
Scaling to 130 MW by late 2027
RFS
Mar/Apr 2027
Term
5 to 10 years
Location
Texas
Price · Inquire · exact quote on connect