Ax3.ai
Home / Marketplace / SHAULA
Reserve now · RFS June 2027Ax3 code · SHAULA · vendor identity private until connect

1,008 NVIDIA Vera Rubin GPUs, dedicated bare metal in a liquid-cooled modular datacenter in Sicily, Italy, June 2027

Deal overview

1,008 NVIDIA Vera Rubin GPUs — 14 NVL72 racks — offered as dedicated bare metal in a liquid-cooled modular datacenter in Sicily, Italy, with a June 2027 ready-for-service target. The deployment can expand to 28 racks (2,016 GPUs). Pricing is $9.70/GPU-hr on a 5-year term; terms run from 3 to 5 years with a 25–35% advance.

Power comes from an on-site power plant combined with solar and batteries. This is the first Vera Rubin capacity on the Ax3 marketplace located in Europe, for buyers who need Rubin-generation compute inside the EU, and the 14-rack starting block with room to double suits a dedicated single-tenant deployment. The public tile shows the headline specification; the complete data room — rack and fabric configuration, exact location, counterparty and full term sheet — is shared once both sides agree to connect.

Cluster size, site and counterparty details are confirmed by Ax3 before any introduction.

Public specification

GPUs
NVIDIA Vera Rubin NVL72 · 14 racks · 1,008 GPUs
Expansion
Up to 28 racks · 2,016 GPUs
Service
Dedicated bare metal
Facility
Liquid-cooled modular datacenter
Power
On-site power plant · solar and batteries
RFS
June 2027
Rate
$9.70/GPU-hr · 5-year term
Term
3 to 5 years
Advance
25–35%
Location
Sicily, Italy

How connecting works

  1. Submit an inquiry on this page — free, no account needed.
  2. Ax3 qualifies and routes it within 24 hours.
  3. Warm introduction with the full spec sheet and exact pricing; identities revealed once both sides agree.
More on the marketplace

Related live deals

Reserve now · RFS Q2 2027Ax3 CODE · MIRZAM
Hot dealGPU ClusterNorthern Ohio, USA
NVIDIA Vera Rubin NVL72, up to 8,064 GPUs at a 35 MW liquid-cooled site in Northern Ohio, Q2 2027
GPUs
Vera Rubin NVL72 · by 1,008-GPU unit (14 racks)
Full site
8 units · up to 8,064 GPUs · 112 racks
Power
35 MW confirmed in writing · 28 MW IT · 1.25 PUE
Timing
Early access May 2027 · full June 2027
Term
5 years · 20% or 25% deposit
Location
Northern Ohio, USA
Price · $7.70/GPU-hr · 5-year term · Reserve ahead of RFS
Ax3 AvailableAx3 CODE · VELA
Hot dealGPU ClusterMassachusetts, USA
NVIDIA Vera Rubin VR200 — 32 Racks, May RFS
GPU
NVIDIA Vera Rubin VR200
Capacity
32× racks
Location
Massachusetts
Availability
May RFS
Rate
$9.90/GPU-hr
Price · $9.90/GPU-hr · 32 racks · May RFS