Home / Marketplace / VEGA 20
Reserve now · RFS March 2027Ax3 code · VEGA 20 · vendor identity private until connect

20 MW AI colocation in Mississippi, ready for service spring 2027

Deal overview

20 MW of AI colocation capacity in Mississippi, with the first block targeting ready-for-service on 31 March 2027. The site is delivered in three blocks on one campus: 20 MW of contract load first, 40 MW cumulative targeted for 30 June 2027, and 100 MW cumulative once a new 161 kV substation is in service in September 2027. A tenant can land an initial deployment next spring and grow on the same site without a second site search.

Power comes from TVA grid service plus on-site natural gas generation, with N+1 redundancy at every block. The build is modular, in 5 MW pads designed for about 105 kW per rack with closed-loop direct liquid cooling and a PUE of about 1.3. Fiber is on site with a second diverse entry planned, and latency to Memphis is 2 to 5 ms. The dates above are targets from the site owner. The public tile shows the headline specification; the complete data room — full spec sheet, exact location, power and cooling design, counterparty, and pricing — is shared once both sides agree to connect.

Every Ax3 listing is vetted by the broker desk before going live: asset existence, control of the capacity, and realistic timelines are confirmed directly with the owner.

Public specification

Block 1
20 MW contract load · target 31 March 2027
Block 2
40 MW cumulative · target 30 June 2027
Block 3
100 MW cumulative · after the new 161 kV substation, September 2027
Type
AI colocation · powered site
Power
TVA grid service + on-site natural gas generation · N+1 at every block
Design
Modular 5 MW pads · about 105 kW per rack
Cooling
Closed-loop direct liquid cooling · PUE about 1.3
Fiber
On site · second diverse entry planned · 2 to 5 ms to Memphis
Location
Mississippi, USA
Deposit
To be confirmed
Price
Inquire · shared on connect

How connecting works

  1. Submit an inquiry on this page — free, no account needed.
  2. Ax3 qualifies and routes it within 24 hours.
  3. Warm introduction with the full spec sheet and exact pricing; identities revealed once both sides agree.
More on the marketplace

Related live deals

Reserve now · Power 2H 2027Ax3 CODE · SIRIUS 1000
Hot dealPowered LandAlabama
600 MW in 24 months, scaling to ~1 GW — 2,000-acre powered land in Alabama with on-site gas
Land
~2,000 acres under contract · ALTA + wetlands done
Grid
600 MW Alabama Power in 24 months · verbally confirmed
Full build
Scaling to ~1 GW from 2029
Gas
Energy Transfer lines near site · up to 1 MM Dth/d
First power
2H 2027 · behind-the-meter gas, indicative
Water
Up to 20 MGD · closed-loop cooling planned
Price · Inquire · ~2,000 ac · 600 MW grid + BTM gas
Ax3 AvailableAx3 CODE · ANTARES 30
Hot dealPowered SiteTexas
30 MW AI colocation in Texas — ready for service spring 2027
Capacity
30 MW
Campus
Scaling to 130 MW by late 2027
RFS
Mar/Apr 2027
Term
5 to 10 years
Location
Texas
Price · Inquire · exact quote on connect