20 MW of AI colocation capacity in Mississippi, with the first block targeting ready-for-service on 31 March 2027. The site is delivered in three blocks on one campus: 20 MW of contract load first, 40 MW cumulative targeted for 30 June 2027, and 100 MW cumulative once a new 161 kV substation is in service in September 2027. A tenant can land an initial deployment next spring and grow on the same site without a second site search.
Power comes from TVA grid service plus on-site natural gas generation, with N+1 redundancy at every block. The build is modular, in 5 MW pads designed for about 105 kW per rack with closed-loop direct liquid cooling and a PUE of about 1.3. Fiber is on site with a second diverse entry planned, and latency to Memphis is 2 to 5 ms. The dates above are targets from the site owner. The public tile shows the headline specification; the complete data room — full spec sheet, exact location, power and cooling design, counterparty, and pricing — is shared once both sides agree to connect.
Every Ax3 listing is vetted by the broker desk before going live: asset existence, control of the capacity, and realistic timelines are confirmed directly with the owner.