Ax3.ai
Home / Marketplace

The live marketplace.

27 live deals — 23 available right now — organized by category, newest first: GPU Availability · Datacenter and Powered Sites · GPU Hardware Sales.

loading wire…··
Category
Region
Deals

GPU Availability

12 available · 14 listedSorted by posting date · newest first

Rentable GPU clusters — Blackwell, VeraRubin and H-class capacity on term.

Reserve now · RFS Q2 2027Ax3 CODE · MIRZAM
Hot dealGPU ClusterNorthern Ohio, USA
NVIDIA Vera Rubin NVL72, up to 8,064 GPUs at a 35 MW liquid-cooled site in Northern Ohio, Q2 2027
GPUs
Vera Rubin NVL72 · by 1,008-GPU unit (14 racks)
Full site
8 units · up to 8,064 GPUs · 112 racks
Power
35 MW confirmed in writing · 28 MW IT · 1.25 PUE
Timing
Early access May 2027 · full June 2027
Term
5 years · 20% or 25% deposit
Location
Northern Ohio, USA
Price · $7.70/GPU-hr · 5-year term · Reserve ahead of RFS
Reserve now · RFS Feb 2027Ax3 CODE · BELLATRIX
Hot dealGPU ClusterSouthern Ontario, Canada
3,360 NVIDIA B300 GPUs, bare metal in a Tier III datacenter in Southern Ontario, February 2027
GPUs
NVIDIA HGX B300 NVL8 · 420 servers · 3,360 GPUs
RFS
Feb 2027 target · bare metal
Power
10 MW Jan 2027 + 10 MW Apr 2027 · up to 200 kW racks
Network
NVIDIA Spectrum-X Ethernet
Term
3 or 5 years · 20% or 25% deposit
Location
Southern Ontario, Canada
Price · $4.60/GPU-hr 5-yr · $5.30 3-yr
Reserve now · RFS Jan 2027Ax3 CODE · POLLUX
Hot dealGPU ClusterSouth Florida, USA
2,048 NVIDIA B300 GPUs in a live Class A datacenter in South Florida, Phase 1 January 2027
GPUs
NVIDIA HGX B300 · 8 per node · air-cooled
Phase 1
184 nodes · 1,472 GPUs · Jan 2027
Phase 2
72 nodes · 576 GPUs · after Jan 2027
Power
5.5 MW energized today · no utility queue
Term
5 years · 20% or 25% deposit
Location
South Florida, USA
Price · $4.60/GPU-hr · 5-year term · Reserve ahead of RFS
Reserve now · RFS April 2027Ax3 CODE · ARCTURUS
Hot dealGPU ClusterCharlotte metro, SC
NVIDIA Vera Rubin NVL72 capacity at scale in the Charlotte metro — live April 2027
GPUs
Vera Rubin NVL72 · by 48-rack data hall (3,456 GPUs)
Phase 1
31 halls · up to 107,136 GPUs · 400 MW off-grid
Full campus
62 halls · up to 214,272 GPUs
RFS
April 15, 2027
Term
5 years · 25% deposit
Cooling / network
Direct-to-chip liquid · InfiniBand
Price · $7.90/GPU-hr · 5-year term · Reserve ahead of RFS
Reserve now · RFS Q1 2027Ax3 CODE · DENEB
Hot dealGPU ClusterTexas
NVIDIA B300 and GB300 GPU capacity in Texas — ready for service Q1 2027
GPUs
NVIDIA B300 and GB300
RFS
Q1 2027
Terms
3, 4 or 5 years
Deposit
20% (5-yr) · 25% (4-yr) · 30% (3-yr)
B300
from $4.09/GPU-hr
GB300
from $4.58/GPU-hr
Location
Texas
Price · B300 from $4.09 · GB300 from $4.58 /GPU-hr
Ax3 AvailableAx3 CODE · CASCADE 2
Hot dealGPU ClusterSeattle, USA
2× GB200 NVL72 — 144 Blackwell GPUs, Live Today, Seattle
GPU
NVIDIA GB200 NVL72 · 144 Blackwell GPUs · 2 racks
Storage
VAST all-flash · 1.16 PB usable
RFS
Live today · 30–45 days to handover
Term
5-year · 40% prepaid
Expansion
+10 GB300 NVL72 racks · 12 total
Fabric
InfiniBand · direct liquid cooling · 24/7 managed
Price · $4.86/GPU-hr · 5-year term · Live today
Ax3 AvailableAx3 CODE · CARINA 1
Hot dealGPU ClusterChicago, USA
Phase 1 — 2,048× B300, Downtown Chicago
GPU
NVIDIA B300 · 2,048 GPUs · 256 nodes
Power
3.8 MW critical IT
RFS
Feb 15, 2027
Term
4-year · 25% deposit
Campus
Phase 1 of 3 · 8,448 GPUs · 23.8 MW total
Fabric
InfiniBand · direct-to-chip liquid · Tier III N+1
Price · $5.20/GPU-hr · 4-year term · RFS Feb 15 2027
Ax3 AvailableAx3 CODE · CARINA 2
Hot dealGPU ClusterChicago, USA
Phase 2 — 3,680× Vera Rubin, Downtown Chicago
GPU
NVIDIA Vera Rubin · 3,680 GPUs · 460 nodes
Power
11.5 MW critical IT
RFS
Aug 31, 2027
Term
5-year · 25% deposit
Campus
Phase 2 of 3 · 8,448 GPUs · 23.8 MW total
Fabric
InfiniBand · direct-to-chip liquid · Tier III N+1
Price · $8.20/GPU-hr · 5-year term · RFS Aug 31 2027
Ax3 AvailableAx3 CODE · CARINA 3
Hot dealGPU ClusterChicago, USA
Phase 3 — 2,720× Vera Rubin, Downtown Chicago
GPU
NVIDIA Vera Rubin · 2,720 GPUs · 340 nodes
Power
8.5 MW critical IT
RFS
Dec 31, 2027
Term
5-year · 25% deposit
Campus
Phase 3 of 3 · 8,448 GPUs · 23.8 MW total
Fabric
InfiniBand · direct-to-chip liquid · Tier III N+1
Price · $8.20/GPU-hr · 5-year term · RFS Dec 31 2027
Ax3 AvailableAx3 CODE · CYGNUS
Hot dealGPU ClusterMassachusetts, USA
GB300 NVL72 — 176 Racks Available Monthly
GPU
NVIDIA GB300 NVL72
Capacity
16× racks/month · 176 racks total
Timeframe
Feb – Dec 2027
Rate
$5.26/GPU-hr
Price · $5.26/GPU-hr · monthly racks · Feb–Dec 2027
Ax3 AvailableAx3 CODE · VELA
Hot dealGPU ClusterMassachusetts, USA
NVIDIA Vera Rubin VR200 — 32 Racks, May RFS
GPU
NVIDIA Vera Rubin VR200
Capacity
32× racks
Location
Massachusetts
Availability
May RFS
Rate
$9.90/GPU-hr
Price · $9.90/GPU-hr · 32 racks · May RFS
Sold
Sold OutAx3 CODE · MAGNETAR
GPU ClusterOhio, USA
1024 × B300 Cluster — Ohio, December 1 RFS
Scale
128 nodes · 1,024× B300 288GB SXM6
Fabric
6.4 Tbps InfiniBand · CX-8 NDF
Storage
512 PB NFS DataStore
Term
36 months
Rate
From $4.75/GPU-hr · 30% prepay
RFS
December 1
Ax3 AvailableAx3 CODE · BLAZAR
Hot dealGPU ClusterWashington, USA
1024 × B300 Build-to-Order — Washington, 10-Week Delivery
Scale
128 nodes · 1,024× B300 288GB HBM3E
Per node
2× EPYC 9555 · 2.25 TB DDR5 · 34.56 TB NVMe
Fabric
6.4 Tbps RoCE
Delivery
10 weeks from contract + prepay
Term
36 months · $4.90/GPU-hr · 25% prepay
Price · $4.90/GPU-hr · build-to-order · expandable
Sold
Sold OutAx3 CODE · LYNX
GPU ClusterEast Coast US
US: H200 2K GPU
Capacity
NVIDIA H200
Quantity
2K GPUs
Rate
2-yr $4.75 · 3-yr $4.55 /GPU-hr
Terms
30% down-payment
RFS
September 15

Datacenter and Powered Sites

13 available · 15 listedSorted by posting date · newest first

Operational and build-to-suit datacenter capacity for lease, plus power-ready sites and land with interconnect — from flowing-today to development-stage.

Reserve now · Power 2H 2027Ax3 CODE · SIRIUS 1000
Hot dealPowered LandAlabama
600 MW in 24 months, scaling to ~1 GW — 2,000-acre powered land in Alabama with on-site gas
Land
~2,000 acres under contract · ALTA + wetlands done
Grid
600 MW Alabama Power in 24 months · verbally confirmed
Full build
Scaling to ~1 GW from 2029
Gas
Energy Transfer lines near site · up to 1 MM Dth/d
First power
2H 2027 · behind-the-meter gas, indicative
Water
Up to 20 MGD · closed-loop cooling planned
Price · Inquire · ~2,000 ac · 600 MW grid + BTM gas
Ax3 AvailableAx3 CODE · ANTARES 30
Hot dealPowered SiteTexas
30 MW AI colocation in Texas — ready for service spring 2027
Capacity
30 MW
Campus
Scaling to 130 MW by late 2027
RFS
Mar/Apr 2027
Term
5 to 10 years
Location
Texas
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · AQUILA
Hot dealAI DatacenterPacific Northwest, USA
Live 2 MW Liquid-Cooled AI Datacenter for Sale
Capacity
2 MW IT
Type
Lease takeover · live & operational
Included
GPU compute, storage & network hardware
Cooling
Direct liquid cooling
Expansion
10 racks · GB300-ready
Lease
Long-term · through 2031
Price · Inquire · exact terms on connect
Ax3 AvailableAx3 CODE · CAPELLA
DatacenterArizona, USA
Co-location Capacity — 350–500 kW, Arizona
Capacity
350–500 kW
Status
Space and power confirmed
Cooling
Air-cooled
Power
Metered
Term
36 months
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · HERCULES
Hot dealPowered SitePoland · EMEA
Lodz 4 — 4 MW IT New-Build Datacenter, Central Poland
Capacity
4 MW IT
Type
New-build datacenter
Location
Lodz, Poland
Payment
Monthly terms
RFS
TBD
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · PHOENIX
Hot dealPowered SiteKentucky
AI Datacenter Opportunity in Kentucky — 50 MW
Capacity
50 MW planned
Phase 1
25 MW
Phase 2
25 MW
Target RFS
~6–9 months
Structure
Built-to-suit · NNN lease
Price · Inquire · exact quote on connect
Sold
Sold OutAx3 CODE · HYDRA
Powered SiteWest Virginia
West Virginia — 60 MW near-term AI capacity
Capacity
60 MW IT · H1 2027
Phase 1
30 MW by end Q1 2027
Phase 2
30 MW by end Q2 2027
Utility power
85 MW at initial site
Expansion
Roadmap to 400+ MW
Build
Rack-ready · liquid-cooled
Sold
Sold OutAx3 CODE · PEGASUS
Powered SiteNorth Carolina
15 MW Tier 3 DC in North Carolina
Capacity
15 MW
Tier
Tier 3
Cooling
Direct liquid (DLC)
Target RFS
Q1 2027
Ax3 AvailableAx3 CODE · PERSEUS 20
Powered SiteTexas
20 MW existing + gas expansion; future gas plants enable GW-scale
Asset
Powered Site
Region
Texas
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · SPICA 285
Hot dealPowered SiteNorth Dakota
285 MW IPP Direct Supply; scalable to GW level
Capacity
285 MW scalable to GW level
Location
North Dakota
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · POLARIS 200
Powered SiteUnited States
Texas 200MW RFS Q3 2026
Capacity
~200MW
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · ORION 100
Powered SiteChicago Metro, IL
100 MW development site — delivery 2028
Capacity
100 MW
Delivery
2028 (fully online)
Connectivity
100 Gb fiber
Status
Soft check confirmed
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · PROCYON 24
Powered SiteWest Georgia
24 MW contracted site — transferable contract
Capacity
24 MW (16 MW flowing)
Power
~5¢ all-in 12-mo avg
Contract
Transferable, thru 2027
Interconnect
115 kV
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · RIGEL 24
Powered SiteAtlanta Metro, GA
24 MW metro site — 16 MW flowing today
Capacity
24 MW (16 MW flowing)
Headroom
8 MW available
Connectivity
100 Gb fiber
Availability
Flowing today
Price · Inquire · exact quote on connect
Ax3 AvailableAx3 CODE · ALTAIR 12
Hot dealPowered SiteSW Kansas
12 MW power-ready site — flowing today
Capacity
~12 MW
Interconnect
115 kV adjacent
Power
~5¢ industrial rate
Availability
Connected & flowing today
Price · Inquire · exact quote on connect

GPU Hardware Sales

1 available · 1 listedSorted by posting date · newest first

Physical GPU and server hardware for purchase — Ax3-direct and partner-listed.

Partner ListingTHIRD-PARTY
AX3-PTR-5001GPU HardwareUnited Kingdom
H200 141 GB hardware available NOW for purchase
Asset
NVIDIA H200 141 GB
Part #
900-21010-0040-000
Quantity
13 pcs
Date code
26+
Price
$35,000 USD ea
Lead time
7 days
Listed by Partner network seller. Specs, pricing and terms are set by the seller — Ax3 is not the counterparty. We can quote an Ax3-sourced comparison alongside it.
For sellers

List a deal.

Submit once — Ax3 verifies, assigns a codename, and places it across the marketplace, LinkedIn, and the newsletter. Free to list; Ax3 is compensated on a successful match.

Listing received. Ax3 will verify the details, assign a codename, and follow up within one business day.

Why sellers list with Ax3

  1. Stay behind a codename — competitors and customers never see idle inventory under your name.
  2. Reach qualified buyers only; every inquiry is vetted before an introduction.
  3. One submission, three channels: marketplace, LinkedIn, and the Ax3 newsletter.

// Feed health status